We post here the relevant closed IPP tenders for the power sector in Africa. Feel free to join our efforts and share us any other you may have found. We'd be glad to add them to the list. Just send an email to This email address is being protected from spambots. You need JavaScript enabled to view it.


 

Submission date: 28 August 2020

Category: IPP

Country: ECOWAS Region

Entity: ECOWAS Centre for Renewable Energy and Energy Efficiency (ECREEE)

Description: In the ECOWAS Region, most countries face the challenges of municipal waste collection and disposal. While the municipalities continue facing the challenges of waste management, the urban populations however continue to grow by the day and thereby compounding the existing problems.

The challenges of municipal waste management is characterized by the lack of adequate and sustainable infrastructural services, especially in the new and ever expanding settlements. One of the services that is severely hampering the development of these expanding settlements is the unavailability of adequate energy services. This therefore results in inadequate energy services and hence rationing of the available resource through frequent power outages. Other infrastructural services such as roads, water and telecommunication services are equally hampered by the expanding urban populations. The expanding urban populations contribute to the current waste management problems as well. The municipalities, who have the ardent task of keeping the cities clean, face numerous challenges in the collection, transportation and disposal of the waste, that is either incinerated in open dumpsites (and often indiscriminately) or left in the open without any proper management system.

To address these problems, ECREEE wants to explore various waste management options that could generate energy from the ‘waste’.

In this context, ECREEE intends to select a maximum of 6 WTE projects from municipal waste from cities in ECOWAS member states to carry out pre-feasibility studies.

            View Announcement >>

 

Publication date: 20 December 2019

Submission date: 30 March 2020

Category: IPP

Country: Togo

Entity: Government of Togo

Description: The Government of Togo – through the Togolese Agency for Rural Electrification and Renewable Energy (Agence Togolaise d’Electrification Rurale et des Energies Renouvelables – AT2ER) – has issued a Request for Pre-Qualification (RFQ) for the design, financing, construction and operation of two grid-connected solar PV plants on an IPP basis with a total installed capacity of 60 to 80 MWac.

The two plants will be located near Awandjélo in the Kara region and near Sokodé in the Central region.

            View Announcement >>

 

Publication date: 9th December 2019

Submission date: 13th December 2019

Category: IPP

Region: Republic of Malawi

Entity: The Ministry of Natural Resources, Energy and Mining

Description: The Ministry of Natural Resources, Energy and Mining would like to inform the general public that continuing with Government determination to find a lasting solution for the power deficiency in the country, it is in the process of developing Mpatamanga Hydropower Project which will be located on the Shire River at Mpatamanga Gorge. This follows a successful feasibility study which the Ministry undertook with funding from the World Bank under the Energy Sector Support Project (ESSP) between 2016 and 2018 

Due to capital requirements for the Project, Cabinet approved that the Project should be implemented through a Public Private Partnership (PPP) arrangement. Government engaged the International Finance Corporation (IFC), a private sector arm of the World Bank to co-develop the project and a Joint Development Agreement was signed between the Government and IFC to this effect. In order to raise more of the required capital, Government together with IFC are planning to identify a Strategic Sponsor for the development, financing, construction, operation and maintenance of the Project. The Strategic Sponsor will be selected through a competitive tender process. 

The Public Private Partnership Commission (PPPC), a key stakeholder and member to a Govemment established Taskforce for the Mpatamanga Hydropower Plant Project successfully conducted a PPP feasibility study which was approved by the Government, through the Ministry of Finance, Economic Planning and Development, thereby allowing PPPC to publicise and call for Requests for Proposals (RFPs) to procure the Strategic Sponsor. 

It is against this background that the PPPC in conjunction with the Ministry of Natural Resources, Energy and Mining has planned to launch the RFP for the selection of a Strategic Sponsor for the development, financing, construction, operation and maintenance of Mpatamanga Hydro Power Plant. The launch will be held at Mount Soche Hotel in Blantyre, on 13th December, 2019 starting at 9:00am. The launch will be presided over by Honourable Bintory Kutsaira, M.P., Minister of Natural Resources, Energy and Mining. 

Subsequently, the PPPC will hold a pre-bidder's conference at the same Mount Soche Hotel, Blantyre in February, 2020 where the project and RFP will be presented directly to prospective bidders and they will be accorded the opportunity to ask questions and visit the project site. 

The Mpatamanga Hydropower Project is a flagship project for the Government and represents the first hydro power project competitively tendered in Malawi. Additionally, it represents one of the largest hydropower investment opportunities currently in the market worldwide. The Government's interest in this investment will be represented by the state owned Electricity Generation Company (EGENCO). ! 

The PPPC in conjunction with the Ministry of Natural Resources, Energy and Mining therefore invites you to this launch of the RFP and your participation will be highly appreciated. 

Patrick C.R. Matanda 

Audrey Mwala Secretary for Natural Resources, Energy Acting Chief Executive Officer and Mining 

Public Private Partnership Commission.

        

        

 

Publication date: 1st September 2019

Submission date: 30th September 2019

Category: IPP

Region: Zimbabwe

Entity: Infrastructure Development Bank of Zimbabwe

Description: The Infrastructure Development Bank of Zimbabwe ((“IDBZ/the Bank”) is a Development Finance Institution established by an Act of Parliament with a mandate to mobilise resources and deploy medium to long-term funding to key infrastructure projects.

            View Announcement >>

        

 

Publication date: 1st August 2019

Submission date: 11th September 2019

Category: IPP

Region: Gaborone

Entity: Botswana Power Corporation

Description: This Request for Qualifications (RFQ) is being used to gather information for future possible tender by Botswana Power Corporation (BPC) for the development of 100MW (2X 50MW) solar plant (s). Through this RFQ, BPC intends to identify suitable Power Project developer(s) willing to participate as independent power producer(s).

            Visit Website >>

 

Publication date: 7th June 2019

Submission date: 23th August 2019

Category: IPP

Region: Eswatini, Southern Africa

Entity: Eswatini Energy Regulatory Authority (ESERA)

Description: Eswatini currently imports the bulk of its electricity supply from neighbouring utilities, such as Eskom in South Africa, to meet its electricity demand. Due to increased uncertainty in the security of such supplies and of tariffs in the Southern African region, the Government has decided to reduce its reliance on imported electricity by encouraging the development of more local power generation.

            Download Announcement >>

 

Publication date: 19th July 2019

Submission date: 2nd August 2019

Category: IPP

Region: South Africa

Entity: Marubeni

Description: Marubeni a leading Japanese trading house, is seeking to secure RSA Equity and/ or BEE equity partner for projects that it is preparing to bid into the renewable IPP program in South Africa. The non-binding EOI is to establish and engage with potencial equity partners, who will form part of the bid consortium led by Marubeni in the future renewable IPP bid rounds. Please contact following email adress if you would like to participate in EOI. This email address is being protected from spambots. You need JavaScript enabled to view it. or This email address is being protected from spambots. You need JavaScript enabled to view it.

 

           

Publication date: 10th Mai 2019

Submission date: 14th June 2019

Category: IPP

Region: Lesotho

Entity: Ministry of Energy and Meteorology (MEM) and United Nations Development Programme (UNDP)

Description: The Government of Lesotho through the Ministry of Energy and Meteorology (MEM) and United Nations Development Programme (UNDP) call for Investment Proposals is part of the implementation of the “Development of Cornerstone Public Policies and Institutional Capacities to Accelerate Sustainable Energy for All (SE4All) Progress” Project in Lesotho. The project aims to catalyse investments in renewable energy-based mini-grids and Energy Centres, to reduce GHG emissions and contribute to the achievement of Lesotho’s Vision 2020 and SE4All goals.

            Visit Website >>

           

Publication date: 12th April 2019

Submission date: 3rd June 2019

Category: IPP

Region: Nigeria

Entity: Rural Electrification Agency (REA)

Description: The REA intends to initially select Applicants for Solar Hybrid Mini Grids for Rural Economic Development (Minimum Subsidy). This component of the NEP will support the development of privately financed and operated mini grids in rural areas with high economic growth potential. The Request for Proposals (RFP) will be for a pilot tender to build, own, and operate solar hybrid mini grids in 57 sites, packaged into four lots in the Niger, Sokoto, Ogun, and Cross River states.

            Download Announcement >>

            Visit Website >>

 

Publication date: 15th April 2019

Submission date: 16th May 2019

Category: IPP

Region: Eswatini (Swaziland)

Entity: Eswatini Energy Regulatory Authority (ESERA)

Description: According to the SGEP, circa 40 MW of solar PV technology will need to be procured by 2020 followed by circa 40 MW of biomass in 2021. This new generation capacity will be procured through competitive tendering processes to be conducted by the Eswatini Energy Regulatory Authority (“ESERA”), in co-operation with the MNRE in accordance with the Electricity Act of 2007. All parties who are interested in potentially becoming developers, investors, financiers, EPC contractors, O&M contractors, etc. in the development of the new generation projects in Eswatini are encouraged to express their interest.

            Download Announcement >>

 

Publication date: 26th November 2018

Submission date: 29th March 2019

Category: IPP

Region: Botswana

Entity: BPC - Botswana Power Corporation

Description: A non-refundable tender documentation fee of One Thousand Five Hundred Pula (1500.00) or Seven Hundred and Fifty Pula (P750.00) for companies wholly owned by the Youth payable in cash at the Botswana Power Corporation Headquarters, Macheng Way, Gaborone or by Electronic Fund Transfer (EFT). Proof of payment is required upon collection of the tender documents or request to be send tender documents via email.

            Visit Website >>

 

Publication date: 19th February 2019

Submission date: 14th March 2019

Category: IPP

Region: Lesotho

Entity: Ministry of Energy and Meteorology

Description: The Government of Lesotho through the Ministry of Energy and Meteorology (MEM) intends to promote the electrification of rural areas of Lesotho through initiatives that will include solar mini-grids.Therefore it has a requested for proposals for the Development, Financing, Construction, Operations, Maintenance and Service Provision For A Mini-grid Pilot.

            Visit Website >>

 

Publication date: 21st December 2018 (Pre-registration for the PQ)

Registration closes: 6th February 2019

Submission date: 13th February 2019

Category: IPP

Region: Zambia

Entity: GET FiT Zambia

Description: In collaboration with the Ministry of Energy (MoE) and other Zambian government stakeholders, GET FiT Zambia is actively creating the framework for Round 2 of the program, the 100 MW GET FiT Zambia Small Hydro Tender. In line with the REFiT Strategy, this tender will support the development of small hydro projects up to 20 MW of installed capacity.

            Download Announcement >>

            Visit Website >>

 

Publication date: 7th December 2018

Submission date: 30th January 2019

Category: IPP

Region: Cape Verde

Entity: Ministry of Industry, Commerce and Energy of Cape Verde

Description: The subject of procurement notice is to launch an international open competitive bidding process mobilizing private sector developers, to design, engineer, construct, commission, finance, own, operate and maintain a 10 MW Wind Power Plant as Independent Power Producer under a BOO (Build, Own, Operate) scheme on Santiago Island, Cabo Verde.

            Download Announcement >>

            Download Tender Documents >>

Publication date: 18th September 2018

Submission date: 19th October 2018

Category: IPP

Region: Tanzania

Entity: TANESCO

Description: TANESCO intends to procure power generation from a set of wind power projects with total capacity of up to 200 MW from Singida, Njombe and Dodoma Regions. Projects should be completed between 2018 and 2020.

            Download RfEoI >>

 

Publication date: 18th September 2018

Submission date: 19th October 2018

Category: IPP

Region: Tanzania

Entity: TANESCO

Description: TANESCO intends to procure power generation from a set of solar photovoltaic (PV) based power projects with total capacity of up to 150 MWp in Dodoma, Singida, Shinyanga, Mwanza, Simiyu and Iringa Regions between years 2018 and 2020.

            Download RfEoI >>

 

Publication date: 19th June 2018

Submission date: 17th August 2018

Category: IPP

Region: Seychelles

Entity: Seychelles Energy Commission

Description: Pursuant with the announcement on the Procurement Oversight Unit (POU) of Seychelles on 19th June 2018, concerning the Solar floating PV IPP tender, the following (updated) instructions are provided to interested applicants.

            Visit Website >>

 

Publication date: 20th December 2017

Submission date: 30th June 2018

Category: IPP

Region: Zambia

Entity: GET FiT Zambia

Description: The ten shortlisted companies or consortia were selected following a competitive Request for Qualification which concluded in June 2018.  During July and August 2018, GET FiT Zambia partnered with  ZESCO to assess the proposed sites to ensure that grid capacity is sufficient to connect the Projects presented at a given location. Having completed this exercise, we now look forward to working with our partners in government and shortlisted firms to ensure a successful outcome to the tender.

            Visit Website >>

 

Publication date: 27th March 2017

Submission date: 5th May 2018

Category: IPP

Region: Zambia

Entity: IDC Industrial Development Corporation

Description: IDC intends to invite private sector developers to compete for the right to develop, finance, construct, operate and maintain utility-scale solar photovoltaic PV IPP projects (each a Project) again using the ‘Scaling Solar’ initiative. IDC has again mandated IFC Advisory as its lead transaction advisor in this regard.

            Donwload RfQ >>

            Download Addendum >>

            Visit Website >>

 

STRATEGIC PARTNERS

Spintelligent
SAAEA
Pennwell
ALER

MEDIA PARTNERS

Renewables Now

EVENT PARTNERS

Africa Energy Forum
Future Energy East Africa
Future Energy Nigeria
Electricx
POWER-GEN Africa
Africa Energy Indaba 2020

Search