Publication date: 24th January 2018
Submission date: 13th February 2018
Category: Consultancy
Region: Ghana
Entity: Electricity Company of Ghana Limited
Description: The objective of the assignment is to assist the ECG in the supervision of the works under the Project. The works include the supervision of the Installation of Bulk Supply Point and Interconnecting Circuits at Juabeso, the Installation of 33kV Switching Station and Interconnecting Circuits at Asankragua, and Installation of 33/11kV Primary Substation in Kumasi.