fbpx

Closed

Engineering, Design, Supply, Installation, Testing and Commissioning of High Voltage Power Reactors for Nambala – Kalumbila 330kV Double Circuit Transmission Lines

Publication date: 26th November 2018

Submission date: 18th January 2019

Category: Construction

Region: Zambia

Entity: ZESCO Limited

Description: ZESCO Limited now invites sealed Bids from eligible Bidders for the construction and completion of Procurement of Engineering, Design, Supply, Installation, Testing and Commissioning of High Voltage Power Reactors for Nambala – Kalumbila 330kV Double Circuit Transmission Lines (hereinafter called “the Facilities”). International Competitive Bidding will be conducted in accordance with the AfDB’s Rules and Procedures for Procurement of Goods and Works, and, specifically, through Single Stage Bidding Procedure.

            Download Announcement >>

 

STRATEGIC PARTNERS

Spintelligent
SAAEA
Pennwell
ALER

MEDIA PARTNERS

Renewables Now

EVENT PARTNERS

Africa Energy Forum
Future Energy East Africa
Future Energy Nigeria
Electricx
POWER-GEN Africa
Africa Energy Indaba 2020

Search