Publication date: 2015, March
Author: African Energy
Description: Power generation demand:
- Southern Africa experiencing a substantial net power deficit;
- Estimated additional power required by 2025 is approx. 25,000 MW;
- All countries seeking various forms of Independent Power Production (IPPʼs);
- Botswana is centrally located within the Southern African Power Grid;
- AFRʼs projects in Botswana are close to the existing grid and can transmit affordable power to anywhere in the region.