fbpx

Closed

Feasibility Studies for Transmission Grid Expansion: Lot 1 – Metoro, Montepuez, Marrupa Transmission Line; Lot 2 – Interconnection of Chimuara, Inhaminga, Dondo/Inchope Transmission Line & Lot 3 – Beluluane, Salamanga Transmission Line

Publication date: 17th May 2019

Submission date: 2nd July 2019

Category: Consultancy

Country: Mozambique

Entity: EDM - Electricidade de Moçambique

Description: The Services comprise an assessment of the Technical Feasibility and Economic Viability in three (3) separate comprehensive feasibility study reports.


 View Announcement >> 

             

STRATEGIC PARTNERS

Spintelligent
SAAEA
Pennwell
ALER

MEDIA PARTNERS

Renewables Now

EVENT PARTNERS

Africa Energy Forum
Future Energy East Africa
Future Energy Nigeria
Electricx
POWER-GEN Africa
Africa Energy Indaba 2020

Search